{"id":5139,"date":"2025-08-14T07:08:20","date_gmt":"2025-08-14T07:08:20","guid":{"rendered":"https:\/\/tezgyan.com\/index.php\/2025\/08\/14\/mumbai-metro-9-double-decker-line-to-link-dahisar-mira-bhayander-to-bkc-and-colaba-all-about-it\/"},"modified":"2025-08-14T07:08:20","modified_gmt":"2025-08-14T07:08:20","slug":"mumbai-metro-9-double-decker-line-to-link-dahisar-mira-bhayander-to-bkc-and-colaba-all-about-it","status":"publish","type":"post","link":"https:\/\/tezgyan.com\/index.php\/2025\/08\/14\/mumbai-metro-9-double-decker-line-to-link-dahisar-mira-bhayander-to-bkc-and-colaba-all-about-it\/","title":{"rendered":"Mumbai Metro-9 Double Decker Line to link Dahisar, Mira-Bhayander to BKC and Colaba: All about it"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div>Mumbai&#8217;s urban mobility is set to experience a radical change following the construction of Metro Line 9, a double-decker wonder that will connect Thane, Bandra Kurla Complex (BKC), and Colaba. The line will go from Dahisar (East) to Mira-Bhayander and beyond.<\/p>\n<p>Initially intended to be an extension of the Red Line (Lines 7\/7A), Metro-9 is roughly 11.38 km of elevated track with 10 stations, including Dahisar East, Pandurang Wadi, Miragaon (Amar Palace), Kashigaon (Thane district), Sai Baba Nagar, Meditiya Nagar (Deepak Hospital), Shahid Bhagat\u202fSingh Garden (Maxus Mall), Subhash Chandra Bose Ground, MBMC Sports Complex and Indralok Station.<\/p>\n<p>With a flyover at the base and the metro running on top, Metro-9&#8217;s double-decker bridge design maximises urban space and makes it easier for the Metro to ascend through already crowded corridors.<\/p>\n<p>\nIn addition to Metro 2A (Dahisar West to DN Nagar) and Metro 7 (Dahisar East to Andheri East), it will eventually be connected to Metro 3 (Colaba-Bandra-SEEPZ subterranean). This network effect speeds up commutes by enabling multi-line routes free from traffic jams, even for those who are not directly on Line 9.<\/p>\n<blockquote class=\"twitter-tweet\"><p>&#13;<\/p>\n<p dir=\"ltr\" lang=\"en\">Thane District Gets Its First Metro: Trial Run of Metro Line-9 Phase-1 Commences<\/p>\n<p>&#13;<br \/>\nMetro Line-9, Connecting Mira Bhayander to Western Suburbs, eastern Suburb and International airport<\/p>\n<p>In a historic development for the Mumbai Metropolitan Region (MMR), the trial run of Phase-1 of\u2026 <a href=\"https:\/\/t.co\/Yp19NBF8JZ\" rel=\"nofollow\" class=\"anchorLink\">pic.twitter.com\/Yp19NBF8JZ<\/a><\/p>\n<p>\u2014 MMRDA (@MMRDAOfficial) <a href=\"https:\/\/twitter.com\/MMRDAOfficial\/status\/1922730756918436215?ref_src=twsrc%5Etfw\" rel=\"nofollow\" class=\"anchorLink\">May 14, 2025<\/a><\/p>\n<\/blockquote>\n<p><strong>Mumbai Metro Line 9 Completion Date<\/strong><\/p>\n<p><a href=\"https:\/\/www.cnbctv18.com\/tags\/mumbai-metro.htm\">Mumbai Metro<\/a> Line 9 is currently under construction, with approximately 85% of the project completed. Phase 1 (Dahisar\u2013Kashigaon) is expected to be completed and put into service by the end of 2025, while the full corridor up to Mira-Bhayander is expected by the end of 2026, according to 99 Acres.<br \/>&#13;\n<\/p>\n<p>\nWith a capacity of 2,352 passengers per train, Mumbai Metro-9 will run eight-coach trains (a shared fleet throughout the Red Line system). By 2031, it is anticipated that 11.12 lakh riders will use Lines 9 and 7A together.<\/p>\n<p><strong>Mumbai Metro Line 9 Fare Details<\/strong><\/p>\n<p>The <a href=\"https:\/\/www.cnbctv18.com\/travel\/mumbai-metro-expansion-which-lines-are-operational-project-cost-and-more-19644564.htm\">Mumbai Metro<\/a> Line 9 will provide commuters with an affordable mode of transportation. The fare structure for Line 9 is in line with Mumbai Metro&#8217;s standard slabs as follows, per the most recent official updates: \u20b910 for up to 2 km, \u20b9 20 for 2\u20135 km, \u20b9 30 for 5\u201312 km, \u20b9 40 for 12\u201318 km, and \u20b9 50 for 18\u201324 km.<\/p>\n<p>Once operational, Metro-9 will easily connect to other lines, including Metro 7 and 7A (for access to the airport), Metro 2A, Metro 3, and upcoming corridors like Metro 10 (to Thane) and Metro 13 (to Vasai-Virar), forming a unified network that will serve commuters across Mumbai&#8217;s northern and western suburbs.<\/p>\n<p>Significant time savings for passengers are expected: the 75\u201390 minute drive from Mira-Bhayander to Andheri East might be reduced to about 35\u201350 minutes using Metro-9 with connecting lines.<\/p>\n<p>Similarly, routes to BKC and Colaba via Metro 7, Metro 2A, or <a href=\"https:\/\/www.cnbctv18.com\/india\/mumbai-md-of-mmrc-explains-why-brand-new-underground-metro-could-not-take-load-of-first-rains-19611682.htm\">Metro<\/a> 3 that are now constrained by traffic will significantly improve in speed and dependability.<\/p>\n<p>With a total expenditure of over \u20b96,607 crore (for Lines 7A and 9), this enormous project is essential to clearing traffic in Mumbai&#8217;s transport system and improving connections for thousands of commuters.<\/p>\n<\/div>\n<p><script async src=\"\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><br \/>\n<br \/><br \/>\n<br \/><a href=\"https:\/\/www.cnbctv18.com\/travel\/mumbai-metro-9-double-decker-line-to-link-dahisar-mira-bhayander-to-bkc-and-colaba-details-19653848.htm\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mumbai&#8217;s urban mobility is set to experience a radical change following the construction of Metro Line 9, a double-decker wonder that will connect Thane, Bandra Kurla Complex (BKC), and Colaba. The line will go from Dahisar (East) to Mira-Bhayander and beyond. Initially intended to be an extension of the Red Line (Lines 7\/7A), Metro-9 is&#8230;<\/p>\n","protected":false},"author":1,"featured_media":5140,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[47],"tags":[],"class_list":["post-5139","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-travel"],"_links":{"self":[{"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/posts\/5139","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/comments?post=5139"}],"version-history":[{"count":0,"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/posts\/5139\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/media\/5140"}],"wp:attachment":[{"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/media?parent=5139"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/categories?post=5139"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/tags?post=5139"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}