{"id":348,"date":"2025-07-31T16:07:28","date_gmt":"2025-07-31T16:07:28","guid":{"rendered":"https:\/\/tezgyan.com\/index.php\/2025\/07\/31\/google-to-invest-rs-51000-crore-in-asias-largest-data-centre-in-visakhapatnam-tech-news\/"},"modified":"2025-07-31T16:07:28","modified_gmt":"2025-07-31T16:07:28","slug":"google-to-invest-rs-51000-crore-in-asias-largest-data-centre-in-visakhapatnam-tech-news","status":"publish","type":"post","link":"https:\/\/tezgyan.com\/index.php\/2025\/07\/31\/google-to-invest-rs-51000-crore-in-asias-largest-data-centre-in-visakhapatnam-tech-news\/","title":{"rendered":"Google To Invest Rs 51,000 Crore In Asia&#8217;s Largest Data Centre In Visakhapatnam | Tech News"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div id=\"story-9476240\">\n<p><span class=\"jsx-730caffcddfd709\">Last Updated:<\/span><time class=\"jsx-730caffcddfd709\">July 31, 2025, 19:54 IST<\/time><\/p>\n<h2 id=\"asubttl-9476240\" class=\"jsx-e71bd712c195739a jsx-4042332197 asubttl-schema\">In April 2025, Google&#8217;s parent company, Alphabet, announced a global investment plan of around Rs 6.37 lakh crore to expand its data centre network<\/h2>\n<figure class=\"jsx-e71bd712c195739a jsx-4042332197 amimg\"><img decoding=\"async\" alt=\"Globally, Google, part of Alphabet Inc, is ramping up its data infrastructure footprint. \" title=\"Globally, Google, part of Alphabet Inc, is ramping up its data infrastructure footprint. \" src=\"https:\/\/images.news18.com\/ibnlive\/uploads\/2021\/07\/1627283897_news18_logo-1200x800.jpg?impolicy=website&amp;width=400&amp;height=225\" loading=\"eager\" fetchpriority=\"high\" class=\"jsx-e71bd712c195739a jsx-4042332197\"\/><\/p>\n<p>Globally, Google, part of Alphabet Inc, is ramping up its data infrastructure footprint. <\/p>\n<\/figure>\n<p id=\"0\" class=\"story_para_0\">Tech giant Google is set to build a massive 1 gigawatt (GW) data centre and its supporting energy infrastructure in Visakhapatnam, Andhra Pradesh, with a total investment of $6 billion (approximately Rs 51,000 crore). This marks Google\u2019s largest-ever data centre project in India and is expected to be one of the biggest in Asia in terms of both scale and investment.<\/p>\n<p id=\"1\" class=\"story_para_1\">According to government sources cited by Reuters, nearly $2 billion (about Rs 17,000 crore) of the total outlay will go toward establishing renewable energy capacity. These clean energy sources will be used to power the high-capacity data centre, reflecting Google\u2019s global push towards sustainable infrastructure.<\/p>\n<p id=\"2\" class=\"story_para_2\">\u201cThis will be Google\u2019s first and largest investment of this kind in India so far,&#8221; the sources said, highlighting the strategic importance of the project.<\/p>\n<p id=\"3\" class=\"story_para_3\">The data centre, once operational, will join the league of \u201chyperscale&#8221; facilities, massive server farms like those operated by Google, Amazon, and Microsoft, that support everything from cloud computing to AI applications.<\/p>\n<p id=\"4\" class=\"story_para_4\">Globally, Google, part of Alphabet Inc, is ramping up its data infrastructure footprint. In April this year, Alphabet announced a global investment plan of $75 billion (around Rs 6.37 lakh crore) to expand its data centre network in 2025. The company is also developing large-scale data hubs in Singapore, Malaysia, and Thailand, as part of its ongoing efforts to support growing digital demand across Asia-Pacific.<\/p>\n<p id=\"5\" class=\"story_para_5\">The Visakhapatnam project underlines the growing strategic importance of India in the global cloud computing and AI ecosystems. It also comes at a time when companies are navigating economic uncertainties and regulatory shifts, including global trade policies under the Trump administration.<\/p>\n<h2>What Does A 1 GW Data Centre Mean?<\/h2>\n<p id=\"7\" class=\"story_para_7\">The \u201c1 gigawatt&#8221; figure refers to the power usage, not the direct storage capacity. A facility with 1 GW of power draw is classified as a hyperscale centre, capable of housing tens of thousands of servers.<\/p>\n<p id=\"8\" class=\"story_para_8\">For instance, if the data centre houses 50,000 servers, and each has an average storage of 10 terabytes (TB), it would translate to a total of 5,00,000 TB, or about 500 million gigabytes (GB). Depending on configuration and purpose, actual capacity could vary between 100 million GB and 1 billion GB, enough to store the data of hundreds of millions of users.<\/p>\n<div class=\"jsx-e71bd712c195739a jsx-4042332197 artcta\"><span data-olk-copy-source=\"MessageBody\">News18 Tech delivers the latest technology updates, including phone launches, gadget reviews, AI advancements, and more. Stay informed with breaking tech <a href=\"https:\/\/www.news18.com\/news\/\">news<\/a>, expert insights, and trends from <a href=\"https:\/\/www.news18.com\/india\/\">India<\/a> and around the <a href=\"https:\/\/www.news18.com\/world\/\">world<\/a>.\u00a0 Also Download the <a href=\"https:\/\/onelink.to\/eng-article-eop\">News18 App<\/a>\u00a0to stay updated!<\/span><\/div>\n<p><span class=\"jsx-e71bd712c195739a jsx-4042332197 coral-count-custom\">view comments<\/span><\/p>\n<ul class=\"jsx-e71bd712c195739a jsx-4042332197 atbtlink Location\"><span>Location :<\/span><\/p>\n<p><span>Visakhapatnam, India, India<\/span><\/p>\n<\/ul>\n<ul class=\"jsx-e71bd712c195739a jsx-4042332197 atbtlink fp\"><span>First Published:<\/span><\/ul>\n<div class=\"jsx-e71bd712c195739a jsx-4042332197 brdcrmb\"><a href=\"https:\/\/www.news18.com\/\">News<\/a>  <a href=\"https:\/\/www.news18.com\/tech\/\">tech<\/a>  <span class=\"brdout\"> Google To Invest Rs 51,000 Crore In Asia&#8217;s Largest Data Centre In Visakhapatnam<\/span><\/div>\n<div id=\"coral-wrap\" class=\"jsx-9278cad478d6a6dc \">\n<div class=\"jsx-9278cad478d6a6dc coral-cont\">\n<div class=\"jsx-9278cad478d6a6dc coltoptxt\">Disclaimer: Comments reflect users\u2019 views, not News18\u2019s. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our <a href=\"https:\/\/www.news18.com\/disclaimer\/\" class=\"jsx-9278cad478d6a6dc\">Terms of Use<\/a> and <a href=\"https:\/\/www.news18.com\/privacy_policy\/\" class=\"jsx-9278cad478d6a6dc\">Privacy Policy<\/a>.<\/div>\n<\/div>\n<\/div>\n<p><span class=\"jsx-e71bd712c195739a jsx-4042332197 rmbtn news18_read_more\">Read More<\/span><\/p>\n<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/www.news18.com\/tech\/google-to-invest-rs-51000-crore-in-asias-largest-data-centre-in-visakhapatnam-ws-dkl-9476240.html\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Last Updated:July 31, 2025, 19:54 IST In April 2025, Google&#8217;s parent company, Alphabet, announced a global investment plan of around Rs 6.37 lakh crore to expand its data centre network Globally, Google, part of Alphabet Inc, is ramping up its data infrastructure footprint. Tech giant Google is set to build a massive 1 gigawatt (GW)&#8230;<\/p>\n","protected":false},"author":1,"featured_media":349,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-348","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/posts\/348","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/comments?post=348"}],"version-history":[{"count":0,"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/posts\/348\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/media\/349"}],"wp:attachment":[{"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/media?parent=348"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/categories?post=348"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tezgyan.com\/index.php\/wp-json\/wp\/v2\/tags?post=348"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}